All subjects
Shipping

CMA CGM continues with Wärtsilä LNG propulsion tech

CMA CGM continues with Wärtsilä LNG propulsion tech
The LNG-powered container vessel CMA CGM Louvre at Hudong Zhonghua Shipbuilding yard in China (photo courtesy CMA CGM).

Finland-headed energy and marine technology group Wärtsilä Oyj has announced that it will supply the LNG Fuel Gas Supply Systems (FGSS) for four new 23 000 TEU container vessels being built for France-headed operator CMA CGM Group at the Hudong Zhonghua Shipbuilding yard in China.

An error occurred

You are logged in as subsbriber at Bioenergy International, but something is wrong.

On your profile you can see what subscriptions you have access to and more information.

Is some of the information wrong – please contact our customer service.

Please reload the page

We could not ascertain if you are logged in or not. Please reload this page.
Bioenergy International premium

Do you want to read the whole article?

Only logged in payed subscribers can read all contents on bioenergyinternational.com
As an subscriber you get:
  • Six editions per year
  • Full access to all digital content
  • The E-magazine Bioenergy international
  • And more ...

This latest order, the value of which has not been disclosed, represents a continuation of Wärtsilä’s supply of fuel gas supply systems to CMA CGM vessels.

During the past six years, Wärtsilä has been contracted to supply 30 of the company’s newbuild vessels with FGSS.

Wärtsilä’s full scope of supply includes system engineering, a dedicated material package, the boil-off gas compressor (BOGC) skid delivery, as well as the supervision, commissioning, and testing of the systems.

Our relationship with both the Hudong Zhonghua Shipyard and CMA CGM has been strong, and this repeat order endorses the value of that relationship. Our dedicated engineering ensures that all specific operational and classification society requirements are met and that the system functions reliably and efficiently under all conditions, commented Harald Øverland, Sales Manager, Wärtsilä Gas Solutions.

The Wärtsilä equipment is scheduled for delivery to the yard in early 2024. The first two vessels are expected to be delivered in Q4 2025, and the remaining two vessels during the second half of 2026.

Most read on Bioenergy International

Get the latest news about Bioenergy

Subscribe for free to our newsletter
Sending request
I accept that Bioenergy International stores and handles my information.
Read more about our integritypolicy here